Gold Member Since 2016
Audited Supplier
Jiangsu Higo New Material Technology Co., Ltd.

Formwork, Aluminum Formwork, Aluminum Alloy manufacturer / supplier in China, offering Film Faced Plywood/Building Formwork Plywood/Construction Formwork, High Quality Aluminum Formwork for High-Rise Building, Aluminum Handset Concrete Formwork for Building and so on.

(/ )

Supplier Homepage Product Aluminum formwork Film Faced Plywood/Building Formwork Plywood/Construction Formwork

Film Faced Plywood/Building Formwork Plywood/Construction Formwork

Purchase Qty.:
(Square Meters)
1,000-4,999 5,000-9,999 10,000+
FOB Unit Price: US $160 US $150 US $140
Purchase Qty. (Square Meters) FOB Unit Price
1,000-4,999 US $160
5,000-9,999 US $150
10,000+ US $140
Get Latest Price
Port: Shanghai, China
Production Capacity: 20000PCS/Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Certification: SGS, CE, TUV
  • Type: Wall formwork
  • Usages Times: 200 Times
  • Usage: Villa, High-Rise Building
  • Transport Package: by Seaworthy
  • Origin: Yangzhou City, Jiangsu Province, China
  • Material: Aluminum alloy
  • Aluminum Alloy: 6061 T6
  • Lapping Form: Special-Shaped Scaffolding
  • Trademark: HIGO
  • Specification: Customize service
  • HS Code: 84806000
Product Description

      Singular Advantage of HIGO Aluminum Frame Laminated Formwork

  • 1,HIGO Formwork Scaffolding System can effectively increase the product life of special-shaped slabs, helping investors to reduce costs as much as possible.

  • 2,Compared with Al-Alloy formwork, HIGO system is much lower in terms of lump sum.

  • 3,IGO has worked out the problem of special-shaped slabs existing in Al-Alloy formwork, thus can be applied in more circumstances.

  • 4,HIGO adopts 100 times of water-based formwork oil. Therefore, no maintenance is required, which can further cut down the cost of raw materials and labor.

    Film Faced Plywood/Building Formwork Plywood/Construction Formwork

    Aluminum Frame wood plywood formwork vs Conventional Formwork

     
    ComparePlywoodAluminum Frame Laminated Formwork
    SizeUnorderedStandardized
    KN30KN/m² Uneven60KN/m² Even
    Early RemovalHard to operate 3 formworks and 3 scaffoldingsEasy to operate 1 formwork and 3 scaffoldings
    Cycle time6-7 days , Long without guarantee3.5-4 days , Short with guarantee/td>
    Efficiency10-15 m²/day/person30-50 m²/day/person
    Turnover5-7 times with large waste and loss100 times ( 600 times for aluminum frame) without waste and loss
    LaborLabor shortage; professional skill requiredAdequate service; proficiency required
    QualityVulnerable, plastering requiredInvulnerable, shape at one time, no need to plastering, high quality
    WastageLarge wasteNo waste; recyclable
    WasteLarge wasteNo waste
    Service charge25-35RMB/ m²Lower than 25-27RMB/m²
    Cost reduction on plastering015-25 RMB/m²
    Price on green construction2RMB/m²0
    Tower craneDependentIndependent
     
     

    Comparison on economic indicator of common formworks

     
    CompareSan'an formworkSteel Shuttering FormworkAluminum FormworkAluminum Frame Laminated Formwork
    Material(mm)formworkSteel plateAl-Alloy plateLaminated plywood
    Thickness(mm)13/155-6412-15
    Weight(kg/m² )10.585-9520-2517-25
    Weight to load(kg/m² )30806060
    Cost(without strut and components)60RMB700RMB1300RMB800RMB
    Turnover6100100-200100-200
    Value for recyclingNo and additional cost on disposalLessMoreMore
    OperationHardNormalEasyEasy (without formwork oil)
    Cost on maintenanceLowHighLowLow
    EfficiencyLowNormalHighHigh
    Application    
         ()
    Dependence on machineryPartly dependentdependentindependentindependent

    HIGO Aluminum Frame Laminated Formwork Scaffolding System adopts one ecological and energy-reserved material of new generation developed independently-the polymer laminated bamboo-wood formwork and combines it with Al-Alloy system together. So it not just inherits all the advantages in the Al-Alloy shuttering system. What's more, adhesion caused by certain chemical reaction between aluminum formwork and concrete will not be a problem any more. At the same time, it is also a breakthrough explained by the highly-reduced cost.
     
Send your message to this supplier
Avatar
Mr. Cheng
*From:
To: Mr. Cheng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now